The control plan

Last updated 6 August 2026

The Control Plan tab is the plan as an operator sees it: one sheet per operation, showing only the characteristics inspected at that station, with the limits that station has to hold.

Moving through the routing

A strip of operation tabs runs across the top, lowest step first, with a button at the end to add one. The header under it names the operation and its type, and for a dimensional operation it prints the effect as a thickness per side, marked as half buildup where that applies, so an operator can see what the station is supposed to add or take off.

The table

ColumnNotes
LabelThe balloon number, matching the marked-up print.
RequirementRendered for the kind: limits with a unit, a thread spec with its gauge bracket, a feature control frame, a basic or reference dimension, a roughness maximum, or note text.
MethodInherited from the characteristic unless overridden here.
ClassCritical rows carry a red bar.
FrequencyInherited unless overridden here.
NotesInherited unless overridden here.
Inspected atThe other stations that check this characteristic.

On a station that is not the final inspection, a dimension also carries a line saying what the operation does to it, for example grows on both sides.

Per-operation overrides

Method, frequency and notes are inherited from the characteristic, and inherited values are drawn muted. Click one and type to override it at this station only: an in-process check on a mill can be a different gauge and a different frequency from the final inspection of the same feature.

An overridden cell carries an OVR badge and a revert control. Emptying the cell puts it back to the inherited value rather than leaving it blank.

Printing

  1. Choose the operation, then press Print. The preview also lets you switch between the control plan and the marked-up drawing.
  2. Sheets are Letter landscape, 11 by 8.5 inches.
  3. Each sheet carries the part number, revision, operation and description, the characteristics inspected there, and five blank rows for handwritten results.
  4. Sheets are numbered page N of M.
  5. Choose Save as PDF in the print dialog to file a copy in your QMS.
Every sheet is footed Working Copy with the date. ctrlPlanner authors control plans; it is not a document control system, and the controlled record is the copy you file and revision-control yourself.

Locking

A plan is either a draft or locked. Lock and Save makes it read-only and writes the file in the same action, so what is on disk is the locked state. The Power Editor disappears while a plan is locked and the control plan refuses edits; unlocking is one click and needs no password, because the authority over a released plan is your QMS rather than a checkbox here.